PREPATION AND RELOCATION OF DOCK 2 AND PREPARATION AND INSTALLATION OF A NEW DOCK IN THE AREA OF ODESSOS SHIPYARD S.A VARNA / 2009 -2010.

Dredging to the set depth, performed with a floating crane 10t, flat barge with crawler excavator, split barge 1000m3, dredging pump, temporary depot and diving team.

12 pieces of old mooring anchors were taken out of Dock 2 with 100 t. floating crane, precise positioning of the new anchors and anchoring of the Dock.

Installation of 20 pcs. mooring anchors situated in the new Dock.