Dredging to the set depth, performed with a floating crane 10t, flat barge with crawler excavator, split barge 1000m3, dredging pump, temporary depot and diving team.
12 pieces of old mooring anchors were taken out of Dock 2 with 100 t. floating crane, precise positioning of the new anchors and anchoring of the Dock.
Installation of 20 pcs. mooring anchors situated in the new Dock.